Knowledge Base · The Plant KPI Dashboard
A guide to the operational questions behind the toolbar.

OEE, reliability and downtime
OEE describes effectiveness against planned production time. Reliability and downtime examine the dependability of equipment and the time lost to interruptions. Keep event, repair and operating-time definitions consistent.
Takt, SMED and first-pass yield
Takt relates available production time to required demand. SMED focuses the discussion on changeover work. FPY considers the proportion of output that passes the process without rework; define the input and pass counts at the same process boundary.
Cpk, energy and hourly rate
Process capability, energy and hourly rate address different measurement questions. Confirm specification limits and the meaning of observations for capability, the energy and output units for energy reporting, and the cost basis for rate calculations.
Separate the fixtures
The preview includes legacy and reference fixtures for additional calculators. Those fixtures are not the same dataset as the new DemoInputsFlat OEE demonstration; do not assume every calculator uses an identical field contract.
Explore The Plant KPI Dashboard
Explore the nine Plant calculator families
Native Quick Calculator tour of all nine families. These are separate manual reference cases, not one shared dataset or a validation of every optional input.
3840 × 2160 tutorial canvas at 20 fps. Real 2560 × 1392 Power BI Desktop screenshots retain their native size; this is a paced step sequence. Recorded from the supplied Pivot PBIX. Its pivoted numeric inputs and explicit prior-period references differ from the earlier long-format preview fixture.
- OEE — Use the same production interval for time, output, scrap and rework. Planned production time is scheduled time less excluded planned stops.
- Reliability — Review scheduled observation hours, failures and repair downtime. The reference case displays MTBF 230.0 h and MTTR 3.3 h.
- Downtime cost — Set duration, capacity, production rate and contribution. The example separates lost contribution, idle labor and overhead in a EUR 2,100 event cost.
- Takt — Match available time and customer demand to one interval. The example uses 450 min and 300 units, giving a required pace of 90 sec per unit.
- SMED — List changeover activities and identify work that can move outside the stopped period. The reference case reduces internal time from 80 to 50 min.
- First Pass Yield — Use the same process boundary for units started, scrap and rework. The 1,000-unit reference case yields 950 first-pass good units and 95.0% FPY.
- Process capability — Enter specifications and suitable variation estimates, or raw measurements. Keep the specification limits distinct from the nominal target.
- Energy — Productive power × operating hours gives consumption. Here 15 kW × 1,600 h = 24,000 kWh; at EUR 0.30/kWh, cost is EUR 7,200.
- Machine Hourly Rate — Review annual machine costs and annual running hours. This reference case displays EUR 26.1/h; optional operator costs are shown separately.