Skip to content
ALLURE
Skip to main content

Allure Analytics

Use the Quick Calculator

Knowledge Base · The Plant KPI Dashboard

Understand a KPI without binding report fields.

The supplied Plant KPI Dashboard overview.

Open the calculator

Choose Quick Calculator and select a metric family from the toolbar. This mode works without bound fields, so it is useful for explaining a calculation or checking one observation.

Keep input units consistent

Record the time unit, production unit and rate convention beside your inputs. Availability, performance and quality inputs must describe the same production interval.

Check before sharing

Compare the result with an independently calculated example. A calculator result describes the entered observation; it does not automatically represent a plant-wide aggregate.

Calculate one OEE observation

Native manual OEE input change, from 600 to 660 produced units, with an independent arithmetic check.

3840 × 2160 tutorial canvas at 20 fps. Real 2560 × 1392 Power BI Desktop screenshots retain their native size; this is a paced step sequence. Recorded from the supplied Pivot PBIX. Its pivoted numeric inputs and explicit prior-period references differ from the earlier long-format preview fixture.

  1. Review the production interval — Scheduled time is 480 min and excluded planned stops are 60 min, giving 420 min planned production. Unplanned downtime is 75 min.
  2. Enter 660 total units — Change Total produced from 600 to 660, keeping scrap 30, rework 20 and ideal cycle time 30 sec. First-pass good becomes 610 units.
  3. Check the OEE independently — Fully productive time is 610 × 30 ÷ 60 = 305 min. Divide by 420 min planned production: 72.62%, displayed as 72.6%. This is one manual case.

Download the 4K animated GIF · Download the 4K MP4